Gripper Leads and Long Leads

Price range: $25.00 through $45.00

SKU: N/A Category:

Description

Nylon with rubber trim ‘gripper’ leads and long leads with brass clip.

Rubber trim within the nylon material prevents the leash from slipping out of your hands. Thick leash with rolled edges means that the leash doesn’t cut into your hands.

2cm and 2.5cm widths.

1.8m, 3m, 5m, 8m and 10m lengths.

Black only.

Additional information

Length-Gripper-Lead

1.8m, 3m, 5m, 8m, 10m

Width-Gripper-Lead

2cm, 2.5cm

Leave a Reply

Your email address will not be published. Required fields are marked *