Price range: $10.00 through $25.00
Nylon Leads and Long Leads
Description
Nylon Leads and Long Leads with Chrome Clip
Low cost leash option
20 mm wide x 1 mm thick
Available in a variety of colours and sizes
Long leads are great for recall training
Additional information
| Size-Nylon-Lead | 1.5 metre, 1.8 metre, 3 metre, 4.5 metre, 6 metre, 7 metre, 9 metre, 10 metre |
|---|---|
| Colours | Black, Blue, Green, Pink, Red |










